翻訳と辞書
Words near each other
・ WELV-LP
・ Welver
・ Welverdiend, Ehlanzeni
・ Welver–Sterkrade railway
・ Welwel, Ethiopia
・ Welwick
・ Welwitsch's bat
・ Welwitschia
・ Welwitschiella
・ Welwitschii
・ Welwyn
・ Welwyn (disambiguation)
・ Welwyn Garden City
・ Welwyn Garden City F.C.
・ Welwyn Garden City Hockey Club
Welwyn Garden City rail crashes
・ Welwyn Garden City railway station
・ Welwyn Hatfield
・ Welwyn Hatfield (UK Parliament constituency)
・ Welwyn Hatfield Borough Council
・ Welwyn Hatfield Borough Council election, 2007
・ Welwyn Hatfield Borough Council election, 2008
・ Welwyn Hatfield Borough Council election, 2012
・ Welwyn Hatfield Borough Council election, 2014
・ Welwyn Hatfield Borough Council election, 2015
・ Welwyn Hatfield Borough Council elections
・ Welwyn Hatfield Borough Council elections 2012
・ Welwyn Hatfield District Council election, 1998
・ Welwyn Hatfield District Council election, 1999
・ Welwyn Hatfield District Council election, 2000


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Welwyn Garden City rail crashes : ウィキペディア英語版
Welwyn Garden City rail crashes

There have been two rail crashes near Welwyn Garden City railway station in Hertfordshire, England, one in 1935 and another less serious accident in 1957.
==1935 crash==
On 15 June 1935, a train from London Kings Cross to Leeds collided with a train from Kings Cross to Newcastle at night. 14 people were killed and 29 injured.
The accident was a rear collision caused by a signalman's error. The signalman at Welwyn Garden City, who had been fairly recently appointed to the box, became confused and accepted two trains into the same block section. The Newcastle train, arriving first, received a signal check and was slowed down to 15‒20 mph; the Leeds train consisting of 11 coaches hauled by Class K3 2-6-0 No 4009 ran into it at approximately 65 mph.
There were several significant features. Firstly, the modern rolling stock withstood the violent collision well, apart from the last coach which was totally destroyed; older coaches would have been crushed, with much heavier loss of life. Secondly, the Inspecting Officer felt that the signalman had been promoted beyond his level of competence for such a busy box, and the assessment and training procedures for signalmen should be improved. Thirdly, he recommended that the block instruments should be linked to the track circuits to prevent future occurrences in such a way that a "Line clear" indication could only be given on the block instrument if the track circuits had registered passage of a train; this was widely adopted and known as Welwyn Control.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Welwyn Garden City rail crashes」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.